Skip to main content

🇻🇳 178 profiles · Engineering review

Minh Uy Production Technology Company Limited factory overview
Aluminum Die-CastingDEWIN On-Ground Audited

Minh Uy Production Technology Company Limited

Minh Uy Production Technology Company Limited

Location
Vietnam

Factory Overview

Minh Uy Production Technology Company Limited is a verified aluminum die-casting manufacturer in Vietnam with 27 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Aluminum Die-Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

4 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audit report Minh Uy.docx

Document

Verified supplier archive file.

File: Audit report Minh Uy.docx
Secure Download

Minh Uy Production Technology Company Limited Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Company Profile.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List Minh uy.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Minh uy.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

27 photos
3D CMM

3D CMM

Factory Overview
Burr treatment

Burr treatment

Production Line
Die casting machine 1

Die casting machine 1

Quality Control
Die casting machine 2

Die casting machine 2

Equipment
Die casting machine 3

Die casting machine 3

Production Line
Die casting mechine

Die casting mechine

Quality Control
Mold 1

Mold 1

Equipment
Mold 2

Mold 2

Production Line
Mold

Mold

Quality Control
Outer view of company 1

Outer view of company 1

Equipment
Outer view of company

Outer view of company

Production Line
Overview of workshop 2

Overview of workshop 2

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Die CastingCNC MachiningSurface Treatment

Equipment Logs

  • 3D CMM
  • Die casting machine 1

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry