Skip to main content

🇻🇳 178 profiles · Engineering review

Moc Phat Trading And Service factory overview
Furniture ManufacturingDEWIN On-Ground Audited

Moc Phat Trading And Service

MOC PHAT TRADING AND SERVICE JOINT STOCK COMPANY

Location
Vietnam

Factory Overview

Moc Phat Trading And Service is a verified furniture manufacturing manufacturer in Vietnam with 64 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Furniture Manufacturing components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

18 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Moc Phat Trading And Service Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MP- Catalogue 1.pdf
Secure Download

Moc Phat Trading And Service Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MP- Catalogue 2.pdf
Secure Download

MP- Material technical standard.pdf

Document

Verified supplier archive file.

File: MP- Material technical standard.pdf
Secure Download

Moc Phat Trading And Service Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MP- Profile company.pdf
Secure Download

MP- Standard quality.pdf

Document

Verified supplier archive file.

File: MP- Standard quality.pdf
Secure Download

MP- Technical data sheet.pdf

Document

Verified supplier archive file.

File: MP- Technical data sheet.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: MP - Dolphin report 20250717.docx
Secure Download

Moc Phat Trading And Service Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MP- Catalogue 1.pdf
Secure Download

Moc Phat Trading And Service Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MP- Catalogue 2.pdf
Secure Download

MP- Material technical standard.pdf

Document

Verified supplier archive file.

File: MP- Material technical standard.pdf
Secure Download

Moc Phat Trading And Service Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MP- Profile company.pdf
Secure Download

MP- Standard quality.pdf

Document

Verified supplier archive file.

File: MP- Standard quality.pdf
Secure Download

MP- Technical data sheet.pdf

Document

Verified supplier archive file.

File: MP- Technical data sheet.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: MP - Dolphin report 20250717.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: MP- QCLDM Score 20250717.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: MP - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: MP- QCLDM Score 20250717.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: MP - List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

128 photos
5S Quality

5S Quality

Factory Overview
Automatic Edge Banding Machine

Automatic Edge Banding Machine

Production Line
Building office

Building office

Quality Control
CNC Drilling Machine

CNC Drilling Machine

Equipment
CNC Panel Cutting Machine

CNC Panel Cutting Machine

Production Line
CNC Router Machine

CNC Router Machine

Quality Control
CNC panel saw

CNC panel saw

Equipment
Edge banding machine 1

Edge banding machine 1

Production Line
Edge banding machine 2

Edge banding machine 2

Quality Control
Edge banding machine 3

Edge banding machine 3

Equipment
Fire extinguisher

Fire extinguisher

Production Line
Label Board

Label Board

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

WoodworkingMetal FrameAssemblyFinishing

Equipment Logs

  • Automatic Edge Banding Machine
  • CNC Drilling Machine
  • CNC Router Machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry