Skip to main content

🇻🇳 178 profiles · Engineering review

Moc Phat Trading And Service (1) factory overview
Furniture ManufacturingDEWIN On-Ground Audited

Moc Phat Trading And Service (1)

MOC PHAT TRADING AND SERVICE JOINT STOCK COMPANY (1)

Location
Vietnam

Factory Overview

Moc Phat Trading And Service (1) is a verified furniture manufacturing manufacturer in Vietnam with 64 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Furniture Manufacturing components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

0 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audited Document Archive Locked

Dolphin Audit and QCLDM reports are currently undergoing bi-annual re-verification. Contact account managers for priority access.

On-Site Visual Audit

High-Resolution verified shop floor logs

5 photos
Automatic Edge Banding Machine

Automatic Edge Banding Machine

Equipment
CNC Drilling Machine

CNC Drilling Machine

Equipment
CNC Router Machine

CNC Router Machine

Factory
Outerview of gate 1

Outerview of gate 1

Factory
Production Area 1

Production Area 1

Products

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

WoodworkingMetal FrameAssemblyFinishing

Equipment Logs

  • Automatic Edge Banding Machine
  • CNC Drilling Machine
  • CNC Router Machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry