Skip to main content

🇻🇳 178 profiles · Engineering review

Ontops Industry factory overview
Aluminum Die-CastingDEWIN On-Ground Audited

Ontops Industry

ONTOPS INDUSTRY COMPANY LIMITED

Location
Vietnam

Factory Overview

Ontops Industry is a verified aluminum die-casting manufacturer in Vietnam with 41 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Aluminum Die-Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

12 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: OT - Business license.pdf
Secure Download

Ontops Industry Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: OT_Company profile 2020.pdf
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: OT - ISO 90012015 certificate.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: OT - Dolphin report 20250416.docx
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: OT - Business license.pdf
Secure Download

Ontops Industry Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: OT_Company profile 2020.pdf
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: OT - ISO 90012015 certificate.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: OT - Dolphin report 20250416.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: OT - QCLDM Score 20250416.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: OT- List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: OT - QCLDM Score 20250416.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: OT- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

82 photos
OT - Company information

OT - Company information

Factory Overview
Aluminum Die-Casting Extrusion Line

Aluminum Die-Casting Extrusion Line

Production Line
Bench drill machine

Bench drill machine

Quality Control
CMM Measurement Room

CMM Measurement Room

Equipment
CNC milling machine 1

CNC milling machine 1

Production Line
CNC milling machine 2

CNC milling machine 2

Quality Control
CNC milling machine 3

CNC milling machine 3

Equipment
Coating thickness gauge

Coating thickness gauge

Production Line
Coordinated measuring machine

Coordinated measuring machine

Quality Control
Daily machine check sheet

Daily machine check sheet

Equipment
Die casting machine

Die casting machine

Production Line
Drilling machine

Drilling machine

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Die CastingCNC MachiningSurface Treatment

Equipment Logs

  • Bench drill machine
  • CNC milling machine 1

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry