Skip to main content

🇻🇳 178 profiles · Engineering review

Pham Duy International Company Limited factory overview
Fitness EquipmentDEWIN On-Ground Audited

Pham Duy International Company Limited

Pham Duy International Company Limited

Location
Vietnam

Factory Overview

Pham Duy International Company Limited is a verified fitness equipment manufacturer in Vietnam with 31 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Fitness Equipment components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Pham Duy 20231113.docx
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Pham Duy 20231229.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list Pham Duy 20231113.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Pham Duy 20231113.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

31 photos
Chemical treatment

Chemical treatment

Factory Overview
Lazer cutting Machine

Lazer cutting Machine

Production Line
Material 1

Material 1

Quality Control
Material

Material

Equipment
Office

Office

Production Line
Outer view of company 1

Outer view of company 1

Quality Control
Outer view of company

Outer view of company

Equipment
Powder coating line 1

Powder coating line 1

Production Line
Powder coating line

Powder coating line

Quality Control
Sample 2

Sample 2

Equipment
Sample 3

Sample 3

Production Line
Sample 4

Sample 4

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Fitness Equipment

Equipment Logs

  • Lazer cutting Machine
  • lathe 1

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry