Skip to main content

🇻🇳 178 profiles · Engineering review

Precision Machining  Dmm factory overview
CNC MachiningDEWIN On-Ground Audited

Precision Machining Dmm

Precision Machining DMM

Location
Vietnam

Factory Overview

Precision Machining Dmm is a verified cnc machining manufacturer in Vietnam with 16 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

CNC Machining components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

3 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audit report DMM.docx

Document

Verified supplier archive file.

File: Audit report DMM.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score DMM.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

16 photos
CNC milling machine

CNC milling machine

Factory Overview
Mold area

Mold area

Production Line
Photo with contacted person

Photo with contacted person

Quality Control
Product (2)

Product (2)

Equipment
Product (3)

Product (3)

Production Line
Product (4)

Product (4)

Quality Control
Product (5)

Product (5)

Equipment
Product (6)

Product (6)

Production Line
Product

Product

Quality Control
QC Room

QC Room

Equipment
Tool rack

Tool rack

Production Line
Workshop overview (2)

Workshop overview (2)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CNC MillingCNC TurningPrecision Machining

Equipment Logs

  • CNC milling machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry