Skip to main content

🇻🇳 178 profiles · Engineering review

Rongbaoyu Vietnam factory overview
Outdoor Power EquipmentDEWIN On-Ground Audited

Rongbaoyu Vietnam

RONGBAOYU VIETNAM COMPANY LIMITED

Location
Vietnam

Factory Overview

Rongbaoyu Vietnam is a verified outdoor power equipment manufacturer in Vietnam with 24 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Outdoor Power Equipment components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

RBY - Business lincence.pdf

Document

Verified supplier archive file.

File: RBY - Business lincence.pdf
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: RBY - ISO 90012015 certificate.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: RBY - Dolphin report 20250513.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: RBY - QCLDM Score 20250513.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: RBY- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

24 photos
Assembly line 1

Assembly line 1

Factory Overview
Assembly line 2

Assembly line 2

Production Line
Assembly line 3

Assembly line 3

Quality Control
Genaral infomation

Genaral infomation

Equipment
Injection machine 1

Injection machine 1

Production Line
Injection machine 2

Injection machine 2

Quality Control
Injection machine 3

Injection machine 3

Equipment
Injection machine 4

Injection machine 4

Production Line
Material mixer machine

Material mixer machine

Quality Control
Mold area

Mold area

Equipment
Motor 1

Motor 1

Production Line
Motor 2

Motor 2

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Outdoor Power Equipment

Equipment Logs

  • Injection machine 1
  • Injection machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry