Skip to main content

🇻🇳 178 profiles · Engineering review

Skyline Trading Production factory overview
Furniture ManufacturingDEWIN On-Ground Audited

Skyline Trading Production

SKYLINE TRADING PRODUCTION COMPANY LIMITED

Location
Vietnam

Factory Overview

Skyline Trading Production is a verified furniture manufacturing manufacturer in Vietnam with 36 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Furniture Manufacturing components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

7 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin Report Skyline.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List Skyline (1).xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List Skyline.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Skyline (1).xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Skyline updated 20231012 (1).xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Skyline updated 20231012.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Skyline.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

36 photos
Outervier of the company

Outervier of the company

Factory Overview
Photo with contacted person

Photo with contacted person

Production Line
Planing machine

Planing machine

Quality Control
Sign company

Sign company

Equipment
office area

office area

Production Line
packing area (2)

packing area (2)

Quality Control
packing area

packing area

Equipment
product

product

Production Line
raw materials (2)

raw materials (2)

Quality Control
raw materials (3)

raw materials (3)

Equipment
raw materials (4)

raw materials (4)

Production Line
raw materials (5)

raw materials (5)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

WoodworkingMetal FrameAssemblyFinishing

Equipment Logs

  • Planing machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry