Skip to main content

🇻🇳 178 profiles · Engineering review

Smctech factory overview
Stamping & BendingDEWIN On-Ground Audited

Smctech

SMCTECH JSC

Location
Vietnam

Factory Overview

Smctech is a verified stamping & bending manufacturer in Vietnam with 69 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Stamping & Bending components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Business Registration_SMCtech.pdf

Document

Verified supplier archive file.

File: Business Registration_SMCtech.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report SMC.docx
Secure Download

Smctech Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: SMCTECH-PROFILE-2023_ENG_V1.0.pdf
Secure Download

SMC_ISO9001-2015-Certificate.pdf

Document

Verified supplier archive file.

File: SMC_ISO9001-2015-Certificate.pdf
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score SMC.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: SMCTECH-CAPACITY-2023_Equipment list.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

69 photos
CNC laser cutting

CNC laser cutting

Factory Overview
Office (2)

Office (2)

Production Line
Office (3)

Office (3)

Quality Control
Office

Office

Equipment
Packing area (2)

Packing area (2)

Production Line
Packing area

Packing area

Quality Control
Powder coating line

Powder coating line

Equipment
Product (2)

Product (2)

Production Line
Product (3)

Product (3)

Quality Control
Product (4)

Product (4)

Equipment
Product

Product

Production Line
Robotic welding

Robotic welding

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Metal StampingProgressive DiesBending

Equipment Logs

  • CNC laser cutting
  • punching machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry