Skip to main content

🇻🇳 178 profiles · Engineering review

T&L Metal Furniture Limited factory overview
Furniture ManufacturingDEWIN On-Ground Audited

T&L Metal Furniture Limited

T&L METAL FURNITURE LIMITED

Location
Vietnam

Factory Overview

T&L Metal Furniture Limited is a verified furniture manufacturing manufacturer in Vietnam with 37 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Furniture Manufacturing components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report T&L Metal furniture.docx
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report T_L Metal furniture revised 20231011.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List T&L Metal Furniture (1).xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List T&L Metal Furniture.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score T&L Metal Furniture.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score T_L Metal Furniture revised 20231011.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

37 photos
6-function wood cutting machine

6-function wood cutting machine

Factory Overview
Bending machine

Bending machine

Production Line
Drying chamber

Drying chamber

Quality Control
Laser cutting machine

Laser cutting machine

Equipment
Packing Area

Packing Area

Production Line
Packing area (2)

Packing area (2)

Quality Control
Polishing machine

Polishing machine

Equipment
Polishing

Polishing

Production Line
Product

Product

Quality Control
Sample (3)

Sample (3)

Equipment
Sample (4)

Sample (4)

Production Line
Sample

Sample

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

WoodworkingMetal FrameAssemblyFinishing

Equipment Logs

  • 6-function wood cutting machine
  • Laser cutting machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry