Skip to main content

🇻🇳 178 profiles · Engineering review

Tan Lap Thanh Plastic Company factory overview
Plastic Injection MoldingDEWIN On-Ground Audited

Tan Lap Thanh Plastic Company

Tan Lap Thanh plastic company

Location
Vietnam

Factory Overview

Tan Lap Thanh Plastic Company is a verified plastic injection molding manufacturer in Vietnam with 27 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic Injection Molding components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

3 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audit report TLT.docx

Document

Verified supplier archive file.

File: Audit report TLT.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List TLT.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score TLT.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

27 photos
CNC milling machine (2)

CNC milling machine (2)

Factory Overview
CNC milling machine (3)

CNC milling machine (3)

Production Line
CNC milling machine

CNC milling machine

Quality Control
Mold area

Mold area

Equipment
Operating instructions

Operating instructions

Production Line
Outside of the company (2)

Outside of the company (2)

Quality Control
Outside of the company

Outside of the company

Equipment
Packing area

Packing area

Production Line
Photo with contacted person

Photo with contacted person

Quality Control
Product

Product

Equipment
Sample (2)

Sample (2)

Production Line
Sample (3)

Sample (3)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingMold MakingAssembly

Equipment Logs

  • CNC milling machine 2
  • CNC milling machine 3

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry