Skip to main content

🇻🇳 178 profiles · Engineering review

Tan Phat Manufacturing factory overview
Valves & FittingsDEWIN On-Ground Audited

Tan Phat Manufacturing

TAN PHAT MANUFACTURING COMPANY LIMITED

Location
Vietnam

Factory Overview

Tan Phat Manufacturing is a verified valves & fittings manufacturer in Vietnam with 59 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Valves & Fittings components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: TP- Business license.pdf
Secure Download

Tan Phat Manufacturing Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: TP- Profile company.pdf
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: TP- Certificate of ISO 9001-2015.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: TP- Dolphin report 20250814.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: TP - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: TP- QCLDM Score 20250814.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

59 photos
Automation Die Casting Machine

Automation Die Casting Machine

Factory Overview
CNC Lathe Machine 1

CNC Lathe Machine 1

Production Line
CNC Lathe machine 2

CNC Lathe machine 2

Quality Control
CNC Lathe machine 3

CNC Lathe machine 3

Equipment
CNC Milling Machine

CNC Milling Machine

Production Line
CNC lathe machine 4

CNC lathe machine 4

Quality Control
CNC lathe machine 5

CNC lathe machine 5

Equipment
CNC lathe machine 6

CNC lathe machine 6

Production Line
CNC lathe machine 7

CNC lathe machine 7

Quality Control
Handheld XRF Spectrometer

Handheld XRF Spectrometer

Equipment
Inspection table

Inspection table

Production Line
Instruction Board

Instruction Board

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CNC MachiningAssemblyPressure Testing

Equipment Logs

  • Automation Die Casting Machine
  • CNC Lathe Machine 1
  • CNC Lathe machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry