Skip to main content

🇻🇳 178 profiles · Engineering review

Tan Phong An Industrial (2) factory overview
Ergonomic FurnitureDEWIN On-Ground Audited

Tan Phong An Industrial (2)

TAN PHONG AN INDUSTRIAL COMPANY LIMITED (2)

Location
Vietnam

Factory Overview

Tan Phong An Industrial (2) is a verified ergonomic furniture manufacturer in Vietnam with 75 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Ergonomic Furniture components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Business licence.pdf

Document

Verified supplier archive file.

File: Business licence.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report TPA.docx
Secure Download

ISO9001-2015.pdf

Document

Verified supplier archive file.

File: ISO9001-2015.pdf
Secure Download

L10.Amended IC- 09th(Y21.06.07)-投资证明 - 修改第08次.pdf

Document

Verified supplier archive file.

File: L10.Amended IC- 09th(Y21.06.07)-投资证明 - 修改第08次.pdf
Secure Download

Tan Phong An Industrial (2) Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: TPAvn Company Profile 2022 - 2022.02.26 updated.pdf
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score TPA.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

75 photos
Assembly 3

Assembly 3

Factory Overview
Company signboard 1

Company signboard 1

Production Line
Company signboard

Company signboard

Quality Control
Hydraulic press 1

Hydraulic press 1

Equipment
Hydraulic press

Hydraulic press

Production Line
Job instructions

Job instructions

Quality Control
Melamine pressing process 1

Melamine pressing process 1

Equipment
Melamine pressing process 2

Melamine pressing process 2

Production Line
Mold 1

Mold 1

Quality Control
Mold area

Mold area

Equipment
Mold

Mold

Production Line
Packing 1

Packing 1

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Ergonomic Furniture

Equipment Logs

  • Hydraulic press 1
  • Packing machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry