Skip to main content

🇻🇳 178 profiles · Engineering review

Tan Vinh Cuu (Tavico Depot) factory overview
Furniture ManufacturingDEWIN On-Ground Audited

Tan Vinh Cuu (Tavico Depot)

TAN VINH CUU JOINT STOCK COMPANY (TAVICO DEPOT)

Location
Vietnam

Factory Overview

Tan Vinh Cuu (Tavico Depot) is a verified furniture manufacturing manufacturer in Vietnam with 91 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Furniture Manufacturing components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: TV- Business license.pdf
Secure Download

Tan Vinh Cuu (Tavico Depot) Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: TV- Profile company.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: TV - Dolphin report 20250724.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: TV - QCLDM Score 20250724.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: TV- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

91 photos
Ash wood billets

Ash wood billets

Factory Overview
Bench Drill Press

Bench Drill Press

Production Line
CNC Router Woodworking Machine

CNC Router Woodworking Machine

Quality Control
CNC cutting machine

CNC cutting machine

Equipment
CNC router machine

CNC router machine

Production Line
Double-sided planer

Double-sided planer

Quality Control
Four-Side Moulder

Four-Side Moulder

Equipment
Industrial Belt Sander

Industrial Belt Sander

Production Line
Instruction work board

Instruction work board

Quality Control
Main workshop 1

Main workshop 1

Equipment
Main workshop 2

Main workshop 2

Production Line
Main workshop 3

Main workshop 3

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

WoodworkingMetal FrameAssemblyFinishing

Equipment Logs

  • Bench Drill Press
  • CNC Router Woodworking Machine
  • CNC cutting machine
  • CNC router machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry