Skip to main content

🇻🇳 178 profiles · Engineering review

Thai Duong Plastic Joint Stock Company factory overview
Plastic Injection MoldingDEWIN On-Ground Audited

Thai Duong Plastic Joint Stock Company

Thai Duong plastic joint stock company

Location
Vietnam

Factory Overview

Thai Duong Plastic Joint Stock Company is a verified plastic injection molding manufacturer in Vietnam with 49 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic Injection Molding components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

12 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audit report Thai Duong.docx

Document

Verified supplier archive file.

File: Audit report Thai Duong.docx
Secure Download

Business licence TD.pdf

Document

Verified supplier archive file.

File: Business licence TD.pdf
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: ISO 9001-2015.pdf
Secure Download

Thai Duong Plastic Joint Stock Company Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Thai Duong JSC Brochure.pdf
Secure Download

Thai Duong Plastic Joint Stock Company Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Thai Duong Plastic Brochure.pdf
Secure Download

Thai Duong Plastic Presentation.pdf

Document

Verified supplier archive file.

File: Thai Duong Plastic Presentation.pdf
Secure Download

Thai Duong Plastic Joint Stock Company Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Thai Duong Plastic Profile.pdf
Secure Download

WCA 2023.pdf

Document

Verified supplier archive file.

File: WCA 2023.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Inspection Equipment.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Lab Equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Thai Duong.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

49 photos
FAIL

FAIL

Factory Overview
List of plastic molds

List of plastic molds

Production Line
Maintenance plan

Maintenance plan

Quality Control
Mold Area (4)

Mold Area (4)

Equipment
Mold area (2)

Mold area (2)

Production Line
Mold area (3)

Mold area (3)

Quality Control
Mold area (5)

Mold area (5)

Equipment
Mold area

Mold area

Production Line
Office

Office

Quality Control
Outside of the company (2)

Outside of the company (2)

Equipment
Outside of the company (3)

Outside of the company (3)

Production Line
Outside of the company (4)

Outside of the company (4)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingMold MakingAssembly

Equipment Logs

  • crusher machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry