Skip to main content

🇻🇳 178 profiles · Engineering review

Thang Loi Import Export Trading Manufacturing factory overview
Plastic & RubberDEWIN On-Ground Audited

Thang Loi Import Export Trading Manufacturing

THANG LOI IMPORT EXPORT TRADING MANUFACTURING COMPANY LIMITED

Location
Vietnam

Factory Overview

Thang Loi Import Export Trading Manufacturing is a verified plastic & rubber manufacturer in Vietnam with 75 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic & Rubber components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

8 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: TLP - Business license.pdf
Secure Download

Thang Loi Import Export Trading Manufacturing Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: TLP - Catalogue.pdf
Secure Download

Thang Loi Import Export Trading Manufacturing Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: TLP - Profile 1.pdf
Secure Download

Thang Loi Import Export Trading Manufacturing Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: TLP - Profile 2.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: TLP - Dolphin report 20241121.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: TLP - ISO 90012015 certificate.pdf
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: TLP - QCLDM Score 20241121.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: TLP - List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

75 photos
Assembling product

Assembling product

Factory Overview
Bench drill machine 2

Bench drill machine 2

Production Line
Bench drill machine 3

Bench drill machine 3

Quality Control
Bench drill machine

Bench drill machine

Equipment
CNC milling machine

CNC milling machine

Production Line
Caliper

Caliper

Quality Control
Crushing machine 1

Crushing machine 1

Equipment
Crushing machine 2

Crushing machine 2

Production Line
Crushing machine 3

Crushing machine 3

Quality Control
EDM machine 1

EDM machine 1

Equipment
EDM machine 2

EDM machine 2

Production Line
EDM machine 3

EDM machine 3

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingRubber MoldingAssembly

Equipment Logs

  • Bench drill machine 2
  • CNC milling machine
  • Injection molding machine 1
  • Lathe machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry