Skip to main content

🇻🇳 178 profiles · Engineering review

Thanh Long Industrial Services Trade factory overview
Stamping & BendingDEWIN On-Ground Audited

Thanh Long Industrial Services Trade

THANH LONG INDUSTRIAL SERVICES TRADE COMPANY LIMITED

Location
Vietnam

Factory Overview

Thanh Long Industrial Services Trade is a verified stamping & bending manufacturer in Vietnam with 141 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Stamping & Bending components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

7 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

2023-Thanh-Long-Introduction-v2.pdf

Document

Verified supplier archive file.

File: 2023-Thanh-Long-Introduction-v2.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Thanh Long 20231012.docx
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Thanh Long updated 202510603.docx
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Thanh Long.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list Thanh Long.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Thanh Long revised 20231011.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Thanh Long.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

141 photos
3D CMM

3D CMM

Factory Overview
CNC laser cutting

CNC laser cutting

Production Line
CNC laser cuuting

CNC laser cuuting

Quality Control
CNC milling machine (2)

CNC milling machine (2)

Equipment
CNC milling machine

CNC milling machine

Production Line
Company name plate

Company name plate

Quality Control
Grinder machine

Grinder machine

Equipment
Mold area

Mold area

Production Line
Outside of the comppany (2)

Outside of the comppany (2)

Quality Control
Outside of the comppany

Outside of the comppany

Equipment
Packing area

Packing area

Production Line
Photo with contacted person

Photo with contacted person

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Metal StampingProgressive DiesBending

Equipment Logs

  • 3D CMM
  • CNC laser cutting
  • CNC laser cuuting
  • CNC milling machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry