
Tho Thanh Phat Die-Casting Company
Tho Thanh Phat die-casting company
Factory Overview
Tho Thanh Phat Die-Casting Company is a verified aluminum die-casting manufacturer in Vietnam with 158 factory photos. Personally audited by our on-ground team, serving international clients worldwide.
Main Production Focus
Aluminum Die-Casting components and assemblies
Transparent Trust Vault
Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.
Audit report Tho Thanh Phat.docx
DocumentVerified supplier archive file.
File: Audit report Tho Thanh Phat.docxAttached File Tho Thanh Phat company.xlsx
DocumentVerified supplier archive file.
File: Attached File Tho Thanh Phat company.xlsxQA & Landed Cost Log (QCLDM)
Scorecard50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.
File: QCLDM Score Tho Thanh Phat.xlsxDolphin Audit — Full Picture
Read directly from this factory's Dolphin audit report — nothing below is estimated.
On-Site Visual Audit
High-Resolution verified shop floor logs

3D CMM

Broing

CNC lathe machine vs area

CNC milling machine 1

CNC milling machine 2

CNC milling machine 4

CNC milling machine

Die-casting machine

Drilling machine area

Drilling machine

Grinding area 1

Grinding area 3
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
Verified
VerifiedLocation
Vietnam, Vietnam
Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.
DEWIN audit score
Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.
Capabilities
Equipment Logs
- 3D CMM
- CNC lathe machine vs area
- CNC milling machine 1
Verified Certifications
Engage This Factory
Get an interactive landed cost quote routed directly to this verified workshop.
Request Direct RFQRequest this factory for your quote