Skip to main content

🇻🇳 178 profiles · Engineering review

Tuan Xam Private Enterprise factory overview
Iron CastingDEWIN On-Ground Audited

Tuan Xam Private Enterprise

Tuan Xam private enterprise

Location
Vietnam

Factory Overview

Tuan Xam Private Enterprise is a verified iron casting manufacturer in Vietnam with 31 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Iron Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

4 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Tuan Xam 20231030.docx
Secure Download

Tuan Xam Private Enterprise Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Profile Tuan Xam.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List Tuan Xam.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Tuan Xam 20231031.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

31 photos
Grinding area via

Grinding area via

Factory Overview
Product (2)

Product (2)

Production Line
Product (3)

Product (3)

Quality Control
Product (5)

Product (5)

Equipment
Product (6)

Product (6)

Production Line
Product (7)

Product (7)

Quality Control
Workshop overview

Workshop overview

Equipment
casting machine (2)

casting machine (2)

Production Line
casting machine

casting machine

Quality Control
crusher machine (2)

crusher machine (2)

Equipment
crusher machine

crusher machine

Production Line
ingredient

ingredient

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Sand CastingMachiningHeat Treatment

Equipment Logs

  • casting machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry