Skip to main content

🇻🇳 178 profiles · Engineering review

Tuong Lai factory overview
Plastic Injection MoldingDEWIN On-Ground Audited

Tuong Lai

Tuong Lai Co.,Ltd

Location
Vietnam

Factory Overview

Tuong Lai is a verified plastic injection molding manufacturer in Vietnam with 86 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic Injection Molding components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Business licence.pdf

Document

Verified supplier archive file.

File: Business licence.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Tuong Lai Co.,Ltd 2023.12.15.docx
Secure Download

Tuong Lai Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Profile- TLC(ENG) (1).pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List Tuong lai Co.,LTD 20231215.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Tuong Lai Co.,LTD 20231215.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

86 photos
5s activity

5s activity

Factory Overview
CNC Milling machine (2)

CNC Milling machine (2)

Production Line
CNC milling machine (3)

CNC milling machine (3)

Quality Control
CNC milling machine

CNC milling machine

Equipment
Grinder machine

Grinder machine

Production Line
Hydraulic press (2)

Hydraulic press (2)

Quality Control
Hydraulic press

Hydraulic press

Equipment
Imformation board (2)

Imformation board (2)

Production Line
Instructions for use

Instructions for use

Quality Control
Key Checklist

Key Checklist

Equipment
Mold area (2)

Mold area (2)

Production Line
Mold area

Mold area

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingMold MakingAssembly

Equipment Logs

  • CNC Milling machine 2
  • CNC milling machine 3
  • Hydraulic press 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry