Skip to main content

🇻🇳 178 profiles · Engineering review

Van Mai Khoi factory overview
Mechanical MachiningDEWIN On-Ground Audited

Van Mai Khoi

VAN MAI KHOI COMPANY LIMITED

Location
Vietnam

Factory Overview

Van Mai Khoi is a verified mechanical machining manufacturer in Vietnam with 37 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Mechanical Machining components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: MK- Business license.pdf
Secure Download

Van Mai Khoi Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: MK- Profile company.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: MK- Dolphin report 20250709.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: MK- QCLDM Score 20250709.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: MK- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

37 photos
Main workshop 2

Main workshop 2

Factory Overview
Bench drill press 1

Bench drill press 1

Production Line
Bench drill press 2

Bench drill press 2

Quality Control
CNC Milling Machine 1

CNC Milling Machine 1

Equipment
CNC Milling Machine 2

CNC Milling Machine 2

Production Line
CNC machine

CNC machine

Quality Control
Horizontal band saw machine

Horizontal band saw machine

Equipment
Inspection tool 1

Inspection tool 1

Production Line
Inspection tool 2

Inspection tool 2

Quality Control
Lathe machine 1

Lathe machine 1

Equipment
Lathe machine 2

Lathe machine 2

Production Line
Main workshop 1

Main workshop 1

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Mechanical Machining

Equipment Logs

  • CNC Milling Machine 1
  • CNC Milling Machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry