Skip to main content

🇻🇳 178 profiles · Engineering review

Viet Nguyen Precision Mechanical factory overview
Mechanical MachiningDEWIN On-Ground Audited

Viet Nguyen Precision Mechanical

VIET NGUYEN PRECISION MECHANICAL COMPANY LIMITED

Location
Vietnam

Factory Overview

Viet Nguyen Precision Mechanical is a verified mechanical machining manufacturer in Vietnam with 50 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Mechanical Machining components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

5 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: VN- Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: VN- Dolphin report 20250709.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: VN- ISO 9001-2015 Certificate.pdf
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: VN- QCLDM Score 20250709.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: VN- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

50 photos
VN- Name card

VN- Name card

Factory Overview
Bending machine

Bending machine

Production Line
CMM machine

CMM machine

Quality Control
CNC lathe machine 1

CNC lathe machine 1

Equipment
CNC lathe machine 2

CNC lathe machine 2

Production Line
CNC machine

CNC machine

Quality Control
CNC milling machine

CNC milling machine

Equipment
Equipment of checklist

Equipment of checklist

Production Line
Inspection equipment

Inspection equipment

Quality Control
Inspection instruction 1

Inspection instruction 1

Equipment
Inspection instruction 2

Inspection instruction 2

Production Line
Inspection room 1

Inspection room 1

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Mechanical Machining

Equipment Logs

  • Bending machine
  • CNC lathe machine 1

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry