Skip to main content

🇻🇳 178 profiles · Engineering review

Viet Thanh Mechanical Production factory overview
Stamping & BendingDEWIN On-Ground Audited

Viet Thanh Mechanical Production

VIET THANH MECHANICAL PRODUCTION COMPANY LIMITED

Location
Vietnam

Factory Overview

Viet Thanh Mechanical Production is a verified stamping & bending manufacturer in Vietnam with 29 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Stamping & Bending components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

4 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: VTH - Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: VTH - Dolphin report 20240805.docx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: VTH - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: VTH - QCLDM Score 20240805.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

29 photos
Bending machine

Bending machine

Factory Overview
CNC cutting machine

CNC cutting machine

Production Line
CNC lathe machine 1

CNC lathe machine 1

Quality Control
CNC lathe machine 2

CNC lathe machine 2

Equipment
Company name plate

Company name plate

Production Line
Company overview 1

Company overview 1

Quality Control
Company overview 2

Company overview 2

Equipment
Grinding before coating

Grinding before coating

Production Line
Hand pallet truck assembling

Hand pallet truck assembling

Quality Control
Lathing machine 1

Lathing machine 1

Equipment
Mig & Tig welding

Mig & Tig welding

Production Line
Mig welding processing

Mig welding processing

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Metal StampingProgressive DiesBending

Equipment Logs

  • Bending machine
  • CNC cutting machine
  • CNC lathe machine 1
  • CNC lathe machine 2

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry