Skip to main content

🇻🇳 178 profiles · Engineering review

Vietmachine Producing And Trading (Ichimens) factory overview
Industrial EquipmentDEWIN On-Ground Audited

Vietmachine Producing And Trading (Ichimens)

VIETMACHINE PRODUCING AND TRADING CO.,LTD (ICHIMENS)

Location
Vietnam

Factory Overview

Vietmachine Producing And Trading (Ichimens) is a verified industrial equipment manufacturer in Vietnam with 113 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Industrial Equipment components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

8 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: ICHI- Business license.pdf
Secure Download

ICHI- CE Certification.pdf

Document

Verified supplier archive file.

File: ICHI- CE Certification.pdf
Secure Download

Vietmachine Producing And Trading (Ichimens) Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: ICHI- Catalogue company.pdf
Secure Download

Vietmachine Producing And Trading (Ichimens) Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: ICHI- Profile company.pdf
Secure Download

ICHI- UKCA Certification.pdf

Document

Verified supplier archive file.

File: ICHI- UKCA Certification.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: ICHI- Dolphin report 20250919.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: ICHI- QCLDM Score 20250919.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: ICHI- List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

113 photos
150-ton Stamping Press Machine 1

150-ton Stamping Press Machine 1

Factory Overview
150-ton Stamping Press Machine 2

150-ton Stamping Press Machine 2

Production Line
Building Office

Building Office

Quality Control
Drilling machines

Drilling machines

Equipment
Fire Extinguisher 2

Fire Extinguisher 2

Production Line
Fire extinguisher 1

Fire extinguisher 1

Quality Control
Heavy-Duty Hydraulic Press

Heavy-Duty Hydraulic Press

Equipment
Horizontal Band Saw machine

Horizontal Band Saw machine

Production Line
Hydraulic Press Brake machine

Hydraulic Press Brake machine

Quality Control
Hydraulic Press machine

Hydraulic Press machine

Equipment
Inspection Room

Inspection Room

Production Line
Instruction board

Instruction board

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

AssemblyWeldingMachining

Equipment Logs

  • 150-ton Stamping Press Machine 1
  • Multi-spindle Automatic Lathe

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry