Skip to main content

🇻🇳 178 profiles · Engineering review

Vinastar Technical Plastic Production And Trading  factory overview
Plastic Injection MoldingDEWIN On-Ground Audited

Vinastar Technical Plastic Production And Trading

VinaStar Technical Plastic Production and Trading Company Limited

Location
Vietnam

Factory Overview

Vinastar Technical Plastic Production And Trading is a verified plastic injection molding manufacturer in Vietnam with 30 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Plastic Injection Molding components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

4 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Vina Star 20231107.docx
Secure Download

Vinastar Technical Plastic Production And Trading Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: Profile Vinastar-2023.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment List Vina Star 20231107.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Vina Star 20231107.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

30 photos
2D VMM

2D VMM

Factory Overview
3D CMM

3D CMM

Production Line
CNC milling machine

CNC milling machine

Quality Control
Micrometer

Micrometer

Equipment
Milling machine

Milling machine

Production Line
Mold area (2)

Mold area (2)

Quality Control
Mold area (3)

Mold area (3)

Equipment
Mold area

Mold area

Production Line
Mold repair area

Mold repair area

Quality Control
Mold repair

Mold repair

Equipment
Mold

Mold

Production Line
Outside of the company (2)

Outside of the company (2)

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Injection MoldingMold MakingAssembly

Equipment Logs

  • 3D CMM
  • CNC milling machine
  • Milling machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry