Skip to main content

🇻🇳 178 profiles · Engineering review

Vinh Loc Metal Mechanical And Electrical Import Ex factory overview
Sheet MetalDEWIN On-Ground Audited

Vinh Loc Metal Mechanical And Electrical Import Ex

VINH LOC METAL MECHANICAL AND ELECTRICAL IMPORT EXPORT TRADING PRODUCTION COMPANY LIMITED

Location
Vietnam

Factory Overview

Vinh Loc Metal Mechanical And Electrical Import Ex is a verified sheet metal manufacturer in Vietnam with 51 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Sheet Metal components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

10 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

VLM - Bussiness license.pdf

Document

Verified supplier archive file.

File: VLM - Bussiness license.pdf
Secure Download

VLM - Company information.pdf

Document

Verified supplier archive file.

File: VLM - Company information.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: VLM - Dolphin report 20250303.docx
Secure Download

VLM - Bussiness license.pdf

Document

Verified supplier archive file.

File: VLM - Bussiness license.pdf
Secure Download

VLM - Company information.pdf

Document

Verified supplier archive file.

File: VLM - Company information.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: VLM - Dolphin report 20250303.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: VLM - QCLDM Score 20250303.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: VLM - List of equipment.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: VLM - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: VLM - QCLDM Score 20250303.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

102 photos
Bench drilling machine

Bench drilling machine

Factory Overview
Bending machine 1

Bending machine 1

Production Line
Bending machine 2

Bending machine 2

Quality Control
Bending machine 3

Bending machine 3

Equipment
Bending machine 4

Bending machine 4

Production Line
CNC drilling machine

CNC drilling machine

Quality Control
CNC wire cutting machine

CNC wire cutting machine

Equipment
CNC wire cutting machines

CNC wire cutting machines

Production Line
Drilling machines 1

Drilling machines 1

Quality Control
Drying line

Drying line

Equipment
Expired powder

Expired powder

Production Line
Hairline finishing machine

Hairline finishing machine

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Sheet MetalLaser CuttingWeldingBending

Equipment Logs

  • Bench drilling machine
  • Bending machine 1
  • CNC drilling machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry