Skip to main content

🇻🇳 178 profiles · Engineering review

Vision - Photo factory overview
CôNg Ty Tnhh Vision (ViệT Nam) Die-Casting, CncDEWIN On-Ground Audited

Vision - Photo

VISION - Photo

Location
Vietnam

Factory Overview

Vision - Photo is a verified công ty tnhh vision (việt nam) die-casting, cnc manufacturer in Vietnam with 39 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

CôNg Ty Tnhh Vision (ViệT Nam) Die-Casting, Cnc components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

0 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audited Document Archive Locked

Dolphin Audit and QCLDM reports are currently undergoing bi-annual re-verification. Contact account managers for priority access.

On-Site Visual Audit

High-Resolution verified shop floor logs

39 photos
Alluminum alloy-raw material

Alluminum alloy-raw material

Factory Overview
CMM machine

CMM machine

Production Line
CNC horizontal lathe

CNC horizontal lathe

Quality Control
CNC machine from 240T to 1500T

CNC machine from 240T to 1500T

Equipment
CNC machines from 240T to 1800T

CNC machines from 240T to 1800T

Production Line
CNC machines

CNC machines

Quality Control
CNC vertical lathe

CNC vertical lathe

Equipment
Company

Company

Production Line
Die Casting Line

Die Casting Line

Quality Control
Die Casting machine 750T

Die Casting machine 750T

Equipment
Die casting 1000T

Die casting 1000T

Production Line
Die casting machine 1250T

Die casting machine 1250T

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CôNg Ty Tnhh Vision (ViệT Nam) Die-Casting, Cnc

Equipment Logs

  • CMM machine
  • CNC horizontal lathe

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry