Skip to main content

🇻🇳 178 profiles · Engineering review

Xinke - Photo factory overview
CôNg Ty Tnhh CôNg Cụ Xinke (ViệT Nam) Die-CastingDEWIN On-Ground Audited

Xinke - Photo

XINKE - Photo

Location
Vietnam

Factory Overview

Xinke - Photo is a verified công ty tnhh công cụ xinke (việt nam) die-casting manufacturer in Vietnam with 65 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

CôNg Ty Tnhh CôNg Cụ Xinke (ViệT Nam) Die-Casting components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

0 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audited Document Archive Locked

Dolphin Audit and QCLDM reports are currently undergoing bi-annual re-verification. Contact account managers for priority access.

On-Site Visual Audit

High-Resolution verified shop floor logs

65 photos
4M Procedure

4M Procedure

Factory Overview
5S

5S

Production Line
Atomic Absorption Spectrometer - AAS

Atomic Absorption Spectrometer - AAS

Quality Control
Automachine-Grinder

Automachine-Grinder

Equipment
Automatic Cutting

Automatic Cutting

Production Line
CMM machine

CMM machine

Quality Control
CNC Machine

CNC Machine

Equipment
CNC milling machines  forging -casting

CNC milling machines forging -casting

Production Line
Chalk procedure

Chalk procedure

Quality Control
Chisel Production Lines

Chisel Production Lines

Equipment
Cleaning machine

Cleaning machine

Production Line
Drilling machine

Drilling machine

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CôNg Ty Tnhh CôNg Cụ Xinke (ViệT Nam) Die-Casting

Equipment Logs

  • Automachine-Grinder
  • CNC Machine
  • Injection machines - double shot
  • Pressing machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry