Skip to main content

🇻🇳 178 profiles · Engineering review

Yuenfung - Photo factory overview
Yuenfung Vietnam (Plastic Injection)DEWIN On-Ground Audited

Yuenfung - Photo

YuenFung - Photo

Location
Vietnam

Factory Overview

Yuenfung - Photo is a verified yuenfung vietnam (plastic injection) manufacturer in Vietnam with 39 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Yuenfung Vietnam (Plastic Injection) components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

0 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audited Document Archive Locked

Dolphin Audit and QCLDM reports are currently undergoing bi-annual re-verification. Contact account managers for priority access.

On-Site Visual Audit

High-Resolution verified shop floor logs

39 photos
Auto conveyor

Auto conveyor

Factory Overview
Auto injectiong and conveyor

Auto injectiong and conveyor

Production Line
Automatic Conveyor

Automatic Conveyor

Quality Control
CMM inspector

CMM inspector

Equipment
Clean bavia area

Clean bavia area

Production Line
Cleaning Bavia station

Cleaning Bavia station

Quality Control
Color samples Cabinet

Color samples Cabinet

Equipment
Conveyor

Conveyor

Production Line
Dry material

Dry material

Quality Control
Dryer conveyor

Dryer conveyor

Equipment
Exhibition

Exhibition

Production Line
Final Inspection

Final Inspection

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Yuenfung Vietnam (Plastic Injection)

Equipment Logs

  • Hard Test machines

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry