Skip to main content

🇻🇳 178 profiles · Engineering review

Yuu Chang International Co., Ltd factory overview
Stamping & BendingDEWIN On-Ground Audited

Yuu Chang International Co., Ltd

Yuu Chang International Co., ltd

Location
Vietnam

Factory Overview

Yuu Chang International Co., Ltd is a verified stamping & bending manufacturer in Vietnam with 10 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Stamping & Bending components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

8 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Audit YCI COST GMP BV 20231006.pdf

Document

Verified supplier archive file.

File: Audit YCI COST GMP BV 20231006.pdf
Secure Download

Audit YCI WM FCCA ITS 20220722.pdf

Document

Verified supplier archive file.

File: Audit YCI WM FCCA ITS 20220722.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Yuu Chang new.docx
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: Dolphin report Yuu Chang.docx
Secure Download

ISO CERTIFICATION 2022 ENGLISH LANGUAGES.pdf

Document

Verified supplier archive file.

File: ISO CERTIFICATION 2022 ENGLISH LANGUAGES.pdf
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: YC Business license 2023.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: Equipment list Yuu Chang.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: QCLDM Score Yuu Chang.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

10 photos
2D VMM

2D VMM

Factory Overview
3D CMM

3D CMM

Production Line
Autonatic bursting strength tester

Autonatic bursting strength tester

Quality Control
Bending machine

Bending machine

Equipment
CNC laser cutting

CNC laser cutting

Production Line
Good area

Good area

Quality Control
Grinding area

Grinding area

Equipment
Multi-axis CNC drilling machine

Multi-axis CNC drilling machine

Production Line
maintenance schedule

maintenance schedule

Quality Control
mold repair area

mold repair area

Equipment

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Metal StampingProgressive DiesBending

Equipment Logs

  • Bending machine
  • CNC laser cutting

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry