Fast from Verified Factories —
Not Just Fast Promises
Every lead time below reflects real production schedules from 178+ audited Vietnamese factories — with Dolphin-certified QC inspection included. No surprises, no middlemen, no guesswork.

Why Our Lead Times Are Reliable
We quote lead times based on factory capacity we've verified in person — not marketing promises.
On-Ground Factory Access
Our team physically visits factories before and during production. We track capacity in real time — not via email.
QC Built Into Every Timeline
All lead times include pre-shipment inspection by our Dolphin-trained auditors. You never receive uninspected parts.
Real-Time Production Updates
You get production photos and progress reports — not silence. We send updates at tooling approval, first article, and pre-ship.
Factory Lead Times by Process
Production lead times from order confirmation, sourced from 178+ audited factories. All times include on-ground QC inspection.
CNC Machining
60+ factories in network💡Air freight Vietnam → US: 3–5 business days
Sheet Metal Fabrication
35+ factories in network💡Includes laser cutting, bending, welding & powder coat
Injection Molding (Tooling)
25+ factories in network💡Production parts: 3–7 days after T1 approval
Die Casting (Tooling)
20+ factories in network💡Includes secondary CNC machining and surface finishing
Metal Stamping (Tooling)
18+ factories in network💡Progressive die and deep draw capabilities
Aluminum Extrusion
12+ factories in network💡Custom die creation included in lead time
Investment Casting
10+ factories in network💡Silica sol (high-quality) and water glass processes
Assembly & Sub-Assembly
15+ factories in network💡Mechanical, electrical, and sub-assembly services
Vietnam → North America Shipping Options
We coordinate export, customs, and delivery. Choose the shipping mode that fits your timeline and volume.
Air Freight (Express DHL/FedEx)
3–5 business days
Premium rate — ideal for prototypes, urgent reorders
Air Freight (Standard)
5–8 business days
Moderate — good for smaller production runs
Sea Freight (FCL)
18–25 days (US West), 25–32 days (US East)
Lowest cost per kg — best for bulk production orders
Sea Freight (LCL)
25–35 days
Low cost — good for volumes below a full container
🌐 Trade & Customs Guidelines for North America
US/CA/MX buyers benefit from $0 Section 301 tariff exemption on Vietnam-origin parts. VCCI Form B Certificate of Origin is required to support the origin claim at US/CA/MX Customs.
Real-World Timeline: CNC Precision Parts
From drawing approval to parts on your dock — a complete picture.
Dewin Vietnam (Audited Factory)
Unverified Overseas Supplier (Typical)
* Lead times are estimates based on typical projects. Actual times vary based on complexity, material, and order volume. Contact us for a project-specific timeline.
QC is Built In — Not an Add-On
Before any part ships, our on-ground Dolphin auditors conduct a pre-shipment inspection against your drawing tolerances and cosmetic specs. This is included in every order — no extra charge.
Factory On-Site Audit
Tooling Approval
First Article (FAI)
Production QC
Pre-Shipment Inspection
Lead Time FAQs
How fast can Vietnamese factories produce parts?
Standard lead times for CNC machined parts from our audited factories are 5–10 production days. Expedited orders can be completed in 3–5 days depending on complexity and material availability.
How long does shipping from Vietnam to the US take?
For visitors in North America, shipping times are roughly: Air Express: 3–5 business days, Sea Freight: 18–32 days.
Does Dewin include quality inspection in the lead time?
Yes. Our on-ground team conducts dimensional inspection, visual check, and review of material certifications before any shipment leaves the factory. QC inspection typically adds 1–2 days to the production lead time.
How many factories are in the Dewin Vietnam network?
178+ audited Vietnam factories across 50+ manufacturing processes. Every factory has completed a 50-point Dolphin audit before joining our network.
Ready to Get a Factory-Confirmed Timeline?
Send us your drawings. We'll match you to the right audited factory and come back with a real production schedule — not a generic estimate.