Skip to main content

🇻🇳 178 profiles · Engineering review

📦 Long-Term Production Program

Blanket Order & VMI Program

Scheduled production runs from 178+ Dolphin-audited Vietnam factories. Fixed pricing. Buffer stock. FTA documentation on every release.

Move beyond one-off orders. Dewin's Blanket Order & VMI program builds a managed, long-term supply relationship between your company and the right Vietnam factory — with 50-point quality assurance and full FTA paperwork on every shipment.

178+
Dolphin-audited Vietnam factories
1,700+
Real factory photos from on-site audits
16+
Free trade agreements covering Vietnam exports
50-pt
Dolphin Audit on every factory in the program

What Is a Blanket Order Program?

Long-term production relationships with Vietnam factories — with fixed pricing, scheduled releases, and Dewin managing every quality and documentation step.

📋

Blanket Purchase Order

You commit to a total annual quantity. The factory reserves capacity and pre-sources raw materials. Individual shipments are "called off" on a schedule — monthly, biweekly, or on demand.

📦

Vendor Managed Inventory (VMI)

Dewin holds 4–8 weeks of finished goods at the factory. When your stock drops below the reorder point, we automatically trigger the next production run and release. No stockouts.

🛡️

Dolphin Audit Quality Guarantee

Every factory on the program scores Tier 1 (90+) or Tier 2 (80+) on the 50-point Dolphin Audit. Pre-shipment inspection is conducted on every release before goods leave Vietnam.

50-Point Dolphin Audit: The Quality Foundation

Every factory on the Blanket Order program has been physically audited against all 5 pillars. Long-term programs demand verified factories — not just marketing brochures.

1

Pillar 1 — Facility & Safety

10 pts

Production floor condition, material storage, fire safety, and environmental compliance — predictors of production stability.

Blanket Order Significance: Critical for long-term production reliability. Unstable facilities create unplanned stoppages.
2

Pillar 2 — Equipment & Capacity

10 pts

Machine models, maintenance records, capacity utilization, and equipment age — determines ability to fulfill blanket volume commitments.

Blanket Order Significance: Factories must have available capacity to absorb your blanket volume before we agree to the program.
3

Pillar 3 — Quality Systems

10 pts

ISO certification (physical verification), NCR system, calibration records, inspection equipment (CMM, VMM, hardness tester).

Blanket Order Significance: Pre-shipment inspection at every release is only as good as the factory's QMS. We verify it in person.
4

Pillar 4 — Workforce & Management

10 pts

Worker stability, management responsiveness, English capability, technical competence, and production planning maturity.

Blanket Order Significance: Long-term programs require stable factory relationships. High-turnover factories are disqualified.
5

Pillar 5 — Export Compliance

10 pts

VCCI registration, Form B issuance capability, COO documentation records, raw material origin traceability, anti-circumvention compliance.

Blanket Order Significance: Non-negotiable for US buyers. Every blanket order factory must score ≥8/10 on this pillar.

FTA Documentation on Every Release

Every shipment release under a Dewin Blanket Order includes the correct CO documentation for your target market — qualifying your parts for FTA import duty savings.

CPTPPComprehensive and Progressive Agreement for Trans-Pacific Partnership
Markets: Canada, Australia, Japan, Mexico, NZ, Singapore, Brunei, Peru, Chile
FTA Benefit: Most industrial goods: 0–5% import duty for Vietnam-origin parts
CO Document: CPTPP Certificate of Origin (CO Form CPTPP)
EVFTAEU-Vietnam Free Trade Agreement
Markets: EU 27 member states
FTA Benefit: Phased reduction to 0% on most industrial goods by 2030; already 0% on many categories
CO Document: EUR.1 Movement Certificate or REX declaration (Registered Exporter)
RCEPRegional Comprehensive Economic Partnership
Markets: ASEAN + China, Japan, South Korea, Australia, New Zealand (15 nations)
FTA Benefit: Progressive tariff reductions; 0% on many goods for Japan/Korea/Australia buyers
CO Document: Form D (ATIGA) or RCEP CO
UKVFTAUK-Vietnam Free Trade Agreement
Markets: United Kingdom
FTA Benefit: FTA successor to EVFTA post-Brexit; most industrial goods 0–5% import duty
CO Document: EUR.1 Movement Certificate (transitional)

FTA rates and eligibility depend on specific HTS codes and rules of origin. Dewin verifies CO eligibility per shipment. Learn more about COO documentation →

How the Blanket Order Program Works

From first drawing to ongoing automated replenishment — managed end-to-end by Dewin's on-ground Vietnam team.

01

Part Qualification & Factory Match

Week 1–2

Submit drawings and annual volumes. Dewin matches to the right Dolphin-audited factory from our 178+ network based on capability, certification, capacity, and QCLDM tier.

02

Blanket Quote & Agreement

Week 2–3

Factory issues a fixed-price blanket quote. Dewin reviews and structures the agreement — unit price, MOQ per release, total annual commitment, price guarantee period, and tooling terms.

03

First Article Inspection (FAI)

Week 3–10 (process-dependent)

Factory produces first article parts. Dewin conducts on-site dimensional inspection and physical audit. You approve FAI. Tooling registered to your account with ownership documentation.

04

Buffer Stock Production

Week 10–14

First production run builds your agreed 4–8 week buffer. Pre-shipment inspection conducted. Buffer stock held at factory, photographed, documented, and ready to release.

05

Scheduled Release Cadence

Ongoing

You call off releases against the blanket — monthly, biweekly, or on-demand. Each release ships with PSI certificate, VCCI Form B COO, material certs, and dimensional report.

06

VMI Auto-Replenishment

Ongoing (automated)

Dewin monitors buffer inventory. When stock drops below reorder point, next production run is automatically triggered. Periodic factory re-audits ensure sustained quality standards.

Factory Network — Blanket Order Ready

All processes are covered. Each factory has been physically audited and holds active QCLDM scores. Blanket orders are available for all processes below.

ProcessAudited FactoriesDolphin Audit FocusTypical FTA Market
CNC Machining (milling, turning, 5-axis)60+CMM / VMM inspection verified on-siteUS, EU, Japan, Australia
Sheet Metal Fabrication35+Laser cutting / CNC bending verifiedUS, EU, UK, RCEP markets
Aluminum Die Casting32+Die cast cell + post-machining + inspectionUS, EU, Australia, Japan
Injection Molding (plastics)42+Mold care + in-process monitoring + color QCUS, EU, UK, Canada
Metal Stamping18+Press force records + tooling conditionUS, EU, Korea, Japan
Investment Casting (lost-wax)15+Wax injection + shell firing + hardness testUS, EU, UK, Australia
Aluminum Extrusion12+Die condition + surface finish + dimensionalUS, EU, RCEP markets
Welded Assemblies20+AWS / ISO weld certs + NDT recordsUS, EU, Australia
3D Printing (SLS, FDM, SLA)10+Machine calibration + material traceabilityUS, EU, Japan, Canada

Why Source Through Dewin vs Direct?

Going direct to a Vietnam factory can work — but managing quality, documentation, and long-term supply risk without an on-ground partner is genuinely hard.

FactorDewin Blanket ProgramDirect FactoryAlibaba / Trade Fair
Factory physically audited (50 criteria)✅ All 5 pillars, in person❌ No❌ No
Real factory photos verified on-site✅ 1,700+ photos in archive⚠️ Factory-provided only❌ Stock photos common
FTA / COO documentation per release✅ Managed by Dewin⚠️ Factory manages, error-prone❌ Buyer responsibility
Pre-shipment inspection every release✅ Dewin on-ground team❌ At buyer's cost❌ Rarely available
VMI / buffer stock management✅ Included in program⚠️ Ad hoc, unmanaged❌ Not offered
Fixed price guarantee✅ 6–12 month lock⚠️ Informal at best❌ No
Quality traceability across releases✅ Per-batch inspection history⚠️ Limited❌ No

What Our Buyers Say

Verified reviews — sourced from dewintech.com

⭐⭐⭐⭐⭐

"The quality, attention to detail, and competitive pricing exceeded all expectations. Working with Dewin has been a game-changer for our supply chain."

Francisco García Quintana
CEO, LAROME
🇺🇸 USA
⭐⭐⭐⭐⭐

"Dewin went above and beyond in every aspect of our project — quality, transparency, and communication were outstanding throughout."

Greg L. Wilhite
President, DOMS
🇺🇸 USA
⭐⭐⭐⭐⭐

"Dewin understood our needs from the first conversation. Reliable, professional, and results-oriented — highly recommended."

Vishnu Shanker
Managing Director, Texas Technology
🇺🇸 USA

Frequently Asked Questions

Ready to Build a Long-Term Vietnam Supply Partnership?

Submit your drawings and annual volumes. Dewin will match your parts to the right Dolphin-audited Vietnam factory, structure a fixed-price blanket quote, and outline the buffer stock and VMI arrangement.

Quick Sourcing Inquiry