Aluminum Motor Housing

Sand casting → die casting conversion — 28% cost reduction, 60% faster delivery

Die CastingCNC MachiningProcess Optimization
28%
Cost Reduction
60%
Faster Lead Time
4 wk
Production Lead Time
10K+
Units / Year

The Challenge

A U.S. industrial equipment manufacturer was sourcing aluminum motor housings via sand casting from a domestic foundry. At $42 per unit with 10-week lead times and recurring porosity issues causing a 4% rejection rate, they needed a better process and a more cost-effective supplier — without sacrificing the IP68 sealing requirements critical for outdoor motor applications.

1. Process Engineering & DFM Review

Rather than simply re-quoting the existing sand casting design, our engineering team proposed a process conversion to high-pressure die casting (HPDC). We conducted a full Design for Manufacturability review:

  • • Redesigned wall thicknesses from 6mm (sand casting) to 3.5mm (HPDC-optimized) — 40% material savings
  • • Added draft angles and revised rib geometry for clean die release
  • • Identified 4 critical machined interfaces requiring post-cast CNC finishing
  • • Mold flow simulation to eliminate porosity in sealing surfaces

2. Factory Selection & Tooling

We matched the project to a Vietnam die casting facility with:

  • • 800-ton cold chamber die casting machines (Toshiba)
  • • In-house tool shop with EDM and CNC die machining
  • • Integrated CNC machining line for post-cast operations
  • • X-ray and CT inspection for internal porosity detection

Tooling was completed in 8 weeks — a 2-cavity die rated for 100,000+ shots. Total tooling investment: $18,500 (amortized at $1.85/unit over the first year).

3. Sample Validation & Pressure Testing

First-article samples were subjected to rigorous testing:

  • • Full CMM dimensional report — all 38 features within spec
  • • X-ray inspection: zero porosity in sealing zones
  • • IP68 pressure test: 1 bar submersion for 30 minutes — pass
  • • Surface finish on machined faces: Ra 1.6 μm (spec: Ra 3.2 μm)
  • • Powder coat adhesion: cross-hatch test — ASTM 5B rating

4. Production & Logistics

With a 2-cavity die, cycle time is 72 seconds per shot (2 parts). Monthly capacity of 2,500 units easily covers the 800/month demand. Parts are CNC machined, powder coated, inspected, and packed in the same facility — no inter-factory logistics. Finished goods ship FOB Ho Chi Minh City, with ocean freight to the U.S. West Coast averaging 18 days. Total production-to-dock lead time: 4 weeks.

Watch: Die Casting Inside a Real Vietnam Factory

This tour from our YouTube channel (@dewintech) walks through a Vietnamese plastic processing and die casting facility — the same category of process capability behind this project.

Vietnam Factory: Plastic Processing & Die Casting

Vietnam Factory: Plastic Processing & Die Casting

Watch on YouTube

More factory walkthroughs on our Factory Video Series page.

Results

✓28% cost reduction — from $42 to $30.25 per unit (incl. tooling amortization)
✓$117,500 annual savings on 10,000-unit volume
✓0.3% rejection rate — down from 4% with sand casting
✓4-week lead time — down from 10 weeks