🏭 Real Client · Real Factory · Dolphin Audited

DOMS — Precision CNC Machined Components

Aluminum & steel CNC turning and milling — matched to an audited Vietnam factory with CMM inspection capability

CNC TurningCNC MillingDolphin AuditedCMM Inspection
85/100
Dolphin Audit Score
5 wk
To First Article Approval
±0.01mm
Tolerance Achieved
~30%
Est. Cost Reduction

About DOMS

DOMS is a U.S.-based industrial manufacturing company sourcing custom precision CNC machined components. Led by President Greg L. Wilhite, DOMS required a reliable manufacturing partner that could hold tight tolerances on a family of aluminum and steel parts — with full CMM inspection documentation and a clear quality audit trail. After our team matched them with an audited Vietnam factory, Greg shared this feedback:

"You and the Dewin team are very thoughtful!! It is a joy to do business with you."

— Greg L. Wilhite, President, DOMS

The Sourcing Challenge

DOMS needed a Vietnam CNC machining partner capable of handling a mixed component family: precision-turned aluminum shafts, milled steel housings, and drilled stainless flanges — all with tight dimensional tolerances (±0.01 mm on critical features) and controlled surface finishes (Ra 1.6 μm on sealing faces).

For a U.S. buyer, the critical question is always: "How do I know the factory is actually capable before I commit tooling and production investment?" That's exactly what our Dolphin Audit process answers — with a scored, documented factory assessment before any purchase order is placed.

How DEWIN Vietnam Helped — 6-Step Process

Step 1
Drawing Review

Our Vietnam engineering team reviewed the full drawing package and identified tolerance class, material, surface treatment, and inspection documentation requirements.

Step 2
Factory Matching

We shortlisted 3 CNC machining factories from our audited network with verified CMM capability, hard anodize lines, and ISO 9001:2015 certification.

Step 3
Dolphin Audit On-Site

Our team conducted a full 50-point Dolphin audit at the selected factory — covering equipment, QC systems, certifications, and traceability. Score: 85/100.

Step 4
Sample Coordination

We managed sample production and conducted our own on-site FAI — CMM balloon report, profilometer surface finish check, anodize thickness verification — before shipping to DOMS.

Step 5
First Article Approved

DOMS approved all components on first submission — 5 weeks from project kick-off, no rework, all critical dimensions within tolerance.

Step 6
Ongoing Oversight

Pre-shipment inspection (AQL 2.5, Level II) on every batch. COO documentation for Vietnam-origin goods. Monthly factory visits by our team.

What the Dolphin Audit Found

Our 50-point Dolphin audit gave DOMS a clear, scored picture of the factory's real capabilities before they committed any tooling investment. Here's what was verified on-site:

Audit PillarWhat We CheckedFinding
Equipment & ProcessCNC turning centers, milling machines, axis count, tooling system✓ Pass — Mazak + Haas, 6-axis capable
Inspection EquipmentCMM make/model, calibration cert, profilometer, gauging✓ Pass — Mitutoyo Crysta-Apex CMM
Quality SystemISO 9001:2015 cert (on-site), procedure docs, NCR system, corrective action✓ Pass — ISO cert verified on-site
DocumentationMill certs, CoC, FAI capability, PPAP Level 2 readiness✓ Pass — PPAP Level 2 capable
Logistics & Lead TimeProduction capacity, scheduling, MOQ, typical lead times✓ Pass — 4-week standard lead time

Dolphin Audit: 50-point, 5-pillar on-site scoring system used by DEWIN Vietnam for all factory qualifications. Full audit report shared with buyer before commitment.

Watch: Real Machined & Metal Part Samples From Our Network

The precision CNC components sourced for clients like DOMS come from factories we visit, audit, and film ourselves. This video from our YouTube channel (@dewintech) shows real custom machined and metal part samples from our audited Vietnam factory network.

Real Vietnam Factory Samples: Custom Machined & Metal Parts

Real Vietnam Factory Samples: Custom Machined & Metal Parts

Watch on YouTube

More on-the-ground footage on our Factory Video Series page.

Why CMM Inspection Matters for Precision Components

For components requiring ±0.01 mm tolerances, hand gauging with calipers simply cannot provide the measurement traceability or accuracy that precision industrial buyers require. A factory with a calibrated CMM (Coordinate Measuring Machine) can:

  • • Generate a full balloon-dimensioned FAI report mapped to your drawing
  • • Provide GD&T callout verification (true position, flatness, cylindricity, runout)
  • • Support PPAP Level 2/3 documentation requirements for industrial customers
  • • Demonstrate Cpk process capability data for critical dimensions

Only a fraction of Vietnam's CNC machining factories in our audited network have in-house CMM capability. We specifically filter for this during factory matching when your application requires FAI documentation or tight tolerance verification.

Vietnam's FTA Advantage

Vietnam-origin goods benefit from 16+ Free Trade Agreements — meaning DOMS's components don't just avoid U.S. Section 301 tariffs; they can also qualify for preferential rates into EU, CPTPP, RCEP, and UKVFTA markets.

CPTPP

11 countries — Japan, Australia, Canada, Mexico + more

EVFTA

EU–Vietnam — 27 EU member states

RCEP

15 Asia-Pacific nations — world's largest FTA by GDP

UKVFTA

UK–Vietnam bilateral trade agreement

Results Summary

✓85/100 Dolphin Audit score — full audit report shared pre-commitment
✓First-article approval in 5 weeks — zero rework on any component
✓±0.01 mm tolerances held on all critical features — CMM-verified
✓Approx. 30% landed cost reduction vs prior China supply source
✓$0 Section 301 tariff — Vietnam-origin parts, COO documented
✓Ongoing PSI every batch — AQL 2.5 Level II, monthly factory visits

"You and the Dewin team are very thoughtful!! It is a joy to do business with you."

— Greg L. Wilhite, President, DOMS