Why zinc
Zinc is cast on hot-chamber machines: thin walls, sharp detail and long die life, and an excellent base for plating. It is about 2.5 times as dense as aluminum, so it suits small, detailed parts such as handles and hardware.
Common grades: Zamak 3 and Zamak 5. Properties and when to choose each grade: Zinc die casting grade guide.
Audited factories that cast zinc
A factory is listed when its audit category, an equipment entry or a site photo names zinc die casting. Factories that only say "die casting" are not counted; ask us and we will check them for your part.
Aluminum die casting in Vietnam
Cold-chamber high-pressure die casting.
Zinc die casting in Vietnam: guide
Zamak alloys, tooling, and when zinc beats aluminum.
All die casting in Vietnam
Process, tooling and inspection overview.
Send a drawing for zinc die casting
Tell us the grade, annual volume and finish. We match the part to a factory that already casts zinc and reply with a quote.
Get My Quote →
