Why aluminum
Aluminum is cast on cold-chamber machines: light parts with good thermal conductivity that keep their strength when warm, for housings, motor covers, brackets and heat sinks.
Common grades: A380, A383 (ADC12) and A360. Properties and when to choose each grade: Aluminum die casting grade guide.
Audited factories that cast aluminum
A factory is listed when its audit category, an equipment entry or a site photo names aluminum die casting. Factories that only say "die casting" are not counted; ask us and we will check them for your part.

Altop Precision Die Casting Company
Vietnam
Equipment on site: Aluminum Die Casting Machine

Dang Thanh Hardware Trading Manufacture
Vietnam
Equipment on site: Aluminum die casting machine

Minh Quang Mechanical Manufacturing
Vietnam
Equipment on site: Aluminum die casting machine 1
Dysm Alumium Die-Casting Co.,Ltd
Vietnam
Audit category: Aluminum Die-Casting
Excellence Team Vietnam Trading Co.,Ltd
Vietnam
Audit category: Aluminum Die-Casting
Gia Phat Mold Mechanical Production Trading
Vietnam
Audit category: Aluminum Die-Casting
Gia Phat Thinh Phu Joint Stock Company
Vietnam
Audit category: Aluminum Die-Casting
Hitech Mould
Vietnam
Audit category: Aluminum Die-Casting
Industrial Mechanics And Automation
Vietnam
Audit category: Aluminum Die-Casting
Katsura Vn
Vietnam
Audit category: Aluminum Die-Casting
Minh Uy Production Technology Company Limited
Vietnam
Audit category: Aluminum Die-Casting
Mktp Co.,Ltd
Vietnam
Audit category: Aluminum Die-Casting
Ontops Industry
Vietnam
Audit category: Aluminum Die-Casting
Tho Thanh Phat Die-Casting Company
Vietnam
Audit category: Aluminum Die-Casting
Zinc die casting in Vietnam
Hot-chamber high-pressure die casting.
All die casting in Vietnam
Process, tooling and inspection overview.
Send a drawing for aluminum die casting
Tell us the grade, annual volume and finish. We match the part to a factory that already casts aluminum and reply with a quote.
Get My Quote →