Supplier-Specific Documentation Review

PPAP Documentation Review for
Vietnam Supplier Profiles

178 listed supplier profiles provide a starting point for research. A listing does not establish PPAP capability, certification or project approval; confirm evidence for the selected supplier and part.

178
Listed supplier profiles
Per supplier
Evidence review required
18
PPAP Checklist Elements
Per project
Buyer approval required

The PPAP Gap Problem in Overseas Sourcing

Start by agreeing the part revision, submission level and documents required by the buyer.

Review document completeness, drawing revisions, dimensional evidence and material-lot traceability for the selected supplier.

Record missing evidence and responsible owners before approving production or accepting a submission package.

Agree the supplier, DEWIN engineering and buyer responsibilities for the specific project. Directory inclusion is not evidence that these tasks have been completed.

Evidence to Request Before Approval

PPAP ChallengeRequired evidenceReview scope
Supplier PPAP experienceRelevant submission examples and supplier scopeSelected supplier
Dimensional verificationInspection plan, results and measurement-system evidenceSpecific part
Material traceabilityMaterial certificates tied to the production lotSpecific lot
FMEA and control planCurrent revisions and agreed critical characteristicsSpecific process
Process capabilityBuyer-required study and acceptance criteriaAgreed production run
PSW authoritySupplier signatory and customer approval recordSpecific submission
Origin documentationApplicable shipment records and specialist reviewSpecific shipment
Document languageAgreed submission language and reviewed translationSpecific package

Supplier Assessment Areas for PPAP Review

Use these assessment areas to request supplier-specific evidence. They do not establish an audit result, PPAP capability or customer approval for every directory record.

⚙️

Equipment & Machinery

PPAP link: Production tooling capability, machine maintenance records for Control Plan documentation

🔍

Quality Management

PPAP link: FMEA readiness, inspection equipment (CMM/VMM/gauges), calibration records for MSA (Element 8)

📋

Management & Organization

PPAP link: Process flow documentation capability, engineering change management, PSW authorization authority

📦

Capacity & Delivery

PPAP link: Customer-specified sample-run capacity and agreed PPAP submission schedule

📜

Compliance & Certifications

PPAP link: ISO 9001 / IATF 16949 status, material traceability system, COO documentation capability

Project review: Record the actual assessment, supporting documents, unresolved gaps and authorized buyer decision for the selected supplier and part.

All 18 PPAP Elements — Review Checklist

Use this checklist to assign document owners and reviewers. The buyer determines the required submission scope; listed tasks are review prompts, not completed services.

#PPAP ElementReview Task to Assign
1Design RecordsConfirm customer drawing revision matches factory's working copy
2Engineering Change DocsTrack and document any ECNs before PPAP submission
3Customer Engineering ApprovalFacilitate buyer sign-off on any design deviations
4Design FMEAReview factory DFMEA against customer drawing criticalities
5Process Flow DiagramVerify process flow matches actual factory sequence during audit visit
6Process FMEAReview PFMEA — ensure detection controls are in place for critical characteristics
7Control PlanVerify control plan covers all critical dimensions and process parameters
8Measurement System AnalysisDocument calibration status of CMM/VMM/gauges used in dimensional study
9Dimensional ResultsAgree the dimensional inspection method, witness requirements and retained results for the part
10Material / Performance Test ResultsCollect mill certs, material COC, hardness/tensile test reports from factory or 3rd-party lab
11Initial Process StudiesAgree capability metrics and customer acceptance criteria for critical characteristics
12Qualified Laboratory DocsVerify 3rd-party lab accreditation certificates if external testing used
13Appearance Approval ReportCoordinate visual standard approval for color/texture/surface parts
14Sample Production PartsConfirm parts were made from production tooling and process — not prototype
15Master SampleRetain master sample at factory; ship customer-retained sample with PPAP package
16Checking AidsRequest gauge and fixture records and verify current calibration status
17Customer-Specific RequirementsFlag and compile any customer SQM (Supplier Quality Manual) requirements
18Part Submission Warrant (PSW)Confirm the supplier signatory and submit the agreed package for customer approval

Inspection Equipment to Verify

Confirm the equipment and measurement evidence needed for the part. The examples below describe review areas; supplier-specific inventory is attributed separately to the linked profiles.

📐

CMM (Coordinate Measuring Machine)

3D dimensional measurement, GD&T callouts, Cpk data, FAI reports

🔬

2D VMM (Video Measuring Machine)

Non-contact optical measurement, quick dimensional results, ideal for small precision parts

💪

Hardness Tester

Rockwell / Brinell hardness verification for material cert corroboration

🎨

Color Comparison Machine

L*a*b* colorimetry, delta-E measurement for AAR (Element 13) on appearance parts

📏

Hand Gauges

Request current calibration records for micrometers, calipers, pin gauges and thread gauges used for the part

🧪

3rd-Party Test Labs

Confirm test methods, laboratory scope and accreditation evidence required by the buyer

Keep PPAP and Shipment Documentation Separate

A PPAP package does not establish country of origin or tariff eligibility. Confirm applicable shipment documents and requirements with the responsible trade-compliance specialist for the actual goods and destination.

  • Identify the manufacturer and shipment document owner.
  • Request relevant production and material records for review.
  • Record required origin documents and unresolved questions before shipment approval.

PPAP Vietnam FAQ

Can a listed supplier provide a complete PPAP package?

A directory listing does not establish PPAP capability. Confirm the chosen supplier, part, submission level, required documents and buyer acceptance criteria before agreeing the project scope.

How does a supplier assessment relate to PPAP?

A supplier assessment can organize evidence about equipment, process controls and quality systems. It does not replace part-specific PPAP review or establish that any listed supplier has passed an audit.

How should inspection equipment be verified?

Equipment listed in a supplier profile is an inventory record. Request current calibration records, measurement-system evidence and a part-specific inspection plan before relying on it for PPAP.

Who owns PPAP documentation and approval?

Agree the supplier document owner, engineering reviewer, customer approver and submission schedule for each project. Record which documents are available and which still require review.

Which PPAP requirements apply to a project?

Use the buyer-provided quality manual and agreed submission requirements. Confirm applicability, acceptance criteria and sign-off authority for the specific part and project.

Plan a Supplier-Specific PPAP Review

Review 178 listed supplier profiles, then confirm the selected supplier, document scope, engineering responsibilities and customer approval requirements for your part.